Hi Alex,
checkbox is better
thanks
Laurent
export HTML
-
- Posts: 13
- Joined: Thu Aug 23, 2012 8:54 am
Re: export HTML
ExportTasksIntoHtml is great, but would really like to have the "enabled" attribute too, is this possible?
Other useful things to be able to report all about existing tasks (maybe on multiple pcs):
- output as xml
- save/convert xsc as xml
- xsc file definition
the idea would be to keep or produce on demand, a report, or excel/xml file, to view the list/diagram of scheduled tasks during a time period.
mike
Other useful things to be able to report all about existing tasks (maybe on multiple pcs):
- output as xml
- save/convert xsc as xml
- xsc file definition
the idea would be to keep or produce on demand, a report, or excel/xml file, to view the list/diagram of scheduled tasks during a time period.
mike
Re: export HTML
Ready in xStarter 1.9.4.50 beta.ExportTasksIntoHtml is great, but would really like to have the "enabled" attribute too, is this possible?
-
- Posts: 13
- Joined: Thu Aug 23, 2012 8:54 am
Re: export HTML
great, wrote you in the same ticket, thanksAlex wrote:Ready in xStarter 1.9.4.50 beta.ExportTasksIntoHtml is great, but would really like to have the "enabled" attribute too, is this possible?
Re: export HTML
HI
Maybe it's better to have "Wide tasks view" in the xStarter itself? With options to view tasks event type/schedule; last launch time; next launch time; task launched by event, schedule or by another task. etc. I don't know only how to show in such grid "variable are never used"...
Maybe it's better to have "Wide tasks view" in the xStarter itself? With options to view tasks event type/schedule; last launch time; next launch time; task launched by event, schedule or by another task. etc. I don't know only how to show in such grid "variable are never used"...
-
- Posts: 13
- Joined: Thu Aug 23, 2012 8:54 am
Re: export HTML
The magic of answering onrostant wrote: ↑Tue Dec 03, 2019 9:53 amHI
Maybe it's better to have "Wide tasks view" in the xStarter itself? With options to view tasks event type/schedule; last launch time; next launch time; task launched by event, schedule or by another task. etc. I don't know only how to show in such grid "variable are never used"...
Tue Dec 03, 2019 10:53 am to a message of
Fri Aug 31, 2012 8:49 am
seven years as only two hours had passed!
-
- Posts: 13
- Joined: Thu Aug 23, 2012 8:54 am
Re: export HTML
Hello,
As I can see there are exists task status in the export to HTML. Which version of xStarter do you have?